{"id":1043,"date":"2026-07-16T23:00:14","date_gmt":"2026-07-16T23:00:14","guid":{"rendered":"https:\/\/tachrone.ma\/blog\/?p=1043"},"modified":"2026-07-20T11:33:54","modified_gmt":"2026-07-20T11:33:54","slug":"bim-maquette-numerique-maroc-guide-2026","status":"publish","type":"post","link":"https:\/\/tachrone.ma\/blog\/bim-maquette-numerique-maroc-guide-2026\/","title":{"rendered":"BIM au Maroc : la maquette num\u00e9rique qui transforme les chantiers"},"content":{"rendered":"<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/d8j0ntlcm91z4.cloudfront.net\/user_3DgEqYVPrudXiXUhzP8W1zFOrIm\/hf_20260716_212107_14e1e44d-fe4a-4b4a-bba7-66a687e903f5.png\" alt=\"Ing\u00e9nieur travaillant sur une maquette num\u00e9rique BIM\" title=\"\"><figcaption>La maquette num\u00e9rique BIM centralise toutes les donn\u00e9es d&rsquo;un projet de construction.<\/figcaption><\/figure>\n<p>Le <strong>BIM au Maroc<\/strong> n&rsquo;est plus un concept r\u00e9serv\u00e9 aux salons professionnels : il s&rsquo;invite progressivement sur les grands chantiers de Casablanca, Rabat, Tanger ou Marrakech. Derri\u00e8re ces trois lettres se cache une nouvelle mani\u00e8re de concevoir, construire et exploiter les b\u00e2timents, autour d&rsquo;une maquette num\u00e9rique 3D enrichie. Pour un promoteur, un bureau d&rsquo;\u00e9tudes ou une entreprise g\u00e9n\u00e9rale, comprendre le BIM (Building Information Modeling) devient un enjeu de comp\u00e9titivit\u00e9. Cet article fait le point, de fa\u00e7on accessible, sur ce qu&rsquo;est r\u00e9ellement le BIM, ses niveaux de maturit\u00e9, ses b\u00e9n\u00e9fices concrets, son adoption dans le contexte marocain et les moyens de se lancer sans se tromper.<\/p>\n<h2>Qu&rsquo;est-ce que le BIM et la maquette num\u00e9rique ?<\/h2>\n<p>Le BIM, ou Building Information Modeling (mod\u00e9lisation des informations du b\u00e2timent), d\u00e9signe \u00e0 la fois une m\u00e9thode de travail collaborative et l&rsquo;outil qui la porte : la maquette num\u00e9rique. Contrairement \u00e0 un simple dessin 3D destin\u00e9 \u00e0 faire joli, cette maquette est une base de donn\u00e9es g\u00e9om\u00e9trique et documentaire. Chaque mur, chaque poteau, chaque fen\u00eatre ou gaine technique y est repr\u00e9sent\u00e9 comme un objet intelligent qui porte des informations : mat\u00e9riau, dimensions, r\u00e9sistance au feu, prix, fabricant, date de pose ou performance thermique.<\/p>\n<p>Concr\u00e8tement, quand un architecte dessine une porte dans la maquette, il ne trace pas seulement un rectangle : il place un composant qui sait qu&rsquo;il est une porte, avec sa largeur, son sens d&rsquo;ouverture et son co\u00fbt. Cette richesse d&rsquo;information est ce qui distingue le BIM du dessin assist\u00e9 par ordinateur classique. La maquette devient une source unique de v\u00e9rit\u00e9, partag\u00e9e entre tous les intervenants du projet.<\/p>\n<h3>De la 2D \u00e0 la maquette enrichie<\/h3>\n<p>Pendant des d\u00e9cennies, la construction s&rsquo;est appuy\u00e9e sur des plans 2D en calque puis en fichiers DAO. Le passage \u00e0 la 3D a d&rsquo;abord \u00e9t\u00e9 esth\u00e9tique, avant de devenir informationnel. Le BIM ajoute \u00e0 la g\u00e9om\u00e9trie une couche de donn\u00e9es exploitables tout au long du cycle de vie du b\u00e2timent, de l&rsquo;esquisse jusqu&rsquo;\u00e0 la d\u00e9molition, en passant par l&rsquo;exploitation.<\/p>\n<h2>Les niveaux de maturit\u00e9 et les LOD<\/h2>\n<p>On distingue plusieurs niveaux de maturit\u00e9 BIM, souvent num\u00e9rot\u00e9s de 0 \u00e0 3. Le niveau 0 correspond au dessin 2D isol\u00e9, sans collaboration. Le niveau 1 m\u00e9lange 2D et 3D avec des fichiers \u00e9chang\u00e9s mais peu structur\u00e9s. Le niveau 2 introduit une r\u00e9elle coordination : chaque acteur travaille sur sa maquette et les fichiers sont f\u00e9d\u00e9r\u00e9s r\u00e9guli\u00e8rement. Le niveau 3, encore rare, vise une maquette unique centralis\u00e9e sur le cloud, accessible en temps r\u00e9el par tous.<\/p>\n<p>\u00c0 ne pas confondre avec la maturit\u00e9, le LOD (Level of Development, niveau de d\u00e9tail et de d\u00e9veloppement) d\u00e9crit la pr\u00e9cision d&rsquo;un \u00e9l\u00e9ment dans la maquette. Un mur en LOD 100 est un simple volume conceptuel ; en LOD 300, il poss\u00e8de ses dimensions et composition r\u00e9elles ; en LOD 500, il correspond \u00e0 l&rsquo;ouvrage tel que construit, pr\u00eat pour l&rsquo;exploitation.<\/p>\n<table style=\"width:100%;border-collapse:collapse;font-size:14px;margin:14px 0\">\n<thead>\n<tr>\n<th style=\"background:#1f3a5f;color:#ffffff;text-align:left;padding:11px 12px\">Niveau<\/th>\n<th style=\"background:#1f3a5f;color:#ffffff;text-align:left;padding:11px 12px\">Description<\/th>\n<th style=\"background:#1f3a5f;color:#ffffff;text-align:left;padding:11px 12px\">Usage typique<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"padding:9px 12px;border-bottom:1px solid #e1e0d9;font-weight:600\">Niveau 0<\/td>\n<td style=\"padding:9px 12px;border-bottom:1px solid #e1e0d9\">Dessin 2D, aucun partage structur\u00e9<\/td>\n<td style=\"padding:9px 12px;border-bottom:1px solid #e1e0d9\">Petits projets, dossiers papier<\/td>\n<\/tr>\n<tr style=\"background:#f5f7fa\">\n<td style=\"padding:9px 12px;border-bottom:1px solid #e1e0d9;font-weight:600\">Niveau 1<\/td>\n<td style=\"padding:9px 12px;border-bottom:1px solid #e1e0d9\">M\u00e9lange 2D\/3D, fichiers \u00e9chang\u00e9s<\/td>\n<td style=\"padding:9px 12px;border-bottom:1px solid #e1e0d9\">Transition vers le num\u00e9rique<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:9px 12px;border-bottom:1px solid #e1e0d9;font-weight:600\">Niveau 2<\/td>\n<td style=\"padding:9px 12px;border-bottom:1px solid #e1e0d9\">Maquettes f\u00e9d\u00e9r\u00e9es, coordination organis\u00e9e<\/td>\n<td style=\"padding:9px 12px;border-bottom:1px solid #e1e0d9\">Standard vis\u00e9 sur les grands projets<\/td>\n<\/tr>\n<tr style=\"background:#f5f7fa\">\n<td style=\"padding:9px 12px;border-bottom:1px solid #e1e0d9;font-weight:600\">Niveau 3<\/td>\n<td style=\"padding:9px 12px;border-bottom:1px solid #e1e0d9\">Maquette unique centralis\u00e9e sur le cloud<\/td>\n<td style=\"padding:9px 12px;border-bottom:1px solid #e1e0d9\">Objectif d&rsquo;avenir, encore rare<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<div style=\"border:1px solid #e1e0d9;border-radius:12px;padding:20px 22px;margin:26px 0;background:#fcfcfb\">\n<div style=\"font-weight:700;font-size:15px;color:#0b0b0b;margin-bottom:2px\">Le niveau de d\u00e9tail de la maquette (LOD)<\/div>\n<div style=\"font-size:12px;color:#898781;margin-bottom:18px\">Indice de d\u00e9veloppement d&rsquo;un \u00e9l\u00e9ment, de conceptuel \u00e0 tel que construit \u2014 \u00e0 titre indicatif 2026<\/div>\n<div style=\"display:flex;align-items:center;gap:10px;margin:8px 0\">\n<div style=\"width:120px;font-size:13px;color:#52514e\">LOD 100<\/div>\n<div style=\"flex:1;background:#eef1f5;border-radius:5px;height:18px\">\n<div style=\"width:20%;background:#86b6ef;height:18px;border-radius:5px\"><\/div>\n<\/div>\n<div style=\"width:150px;text-align:right;font-size:13px;color:#0b0b0b\">Volume conceptuel<\/div>\n<\/div>\n<div style=\"display:flex;align-items:center;gap:10px;margin:8px 0\">\n<div style=\"width:120px;font-size:13px;color:#52514e\">LOD 300<\/div>\n<div style=\"flex:1;background:#eef1f5;border-radius:5px;height:18px\">\n<div style=\"width:60%;background:#3987e5;height:18px;border-radius:5px\"><\/div>\n<\/div>\n<div style=\"width:150px;text-align:right;font-size:13px;color:#0b0b0b\">Dimensions r\u00e9elles<\/div>\n<\/div>\n<div style=\"display:flex;align-items:center;gap:10px;margin:8px 0\">\n<div style=\"width:120px;font-size:13px;color:#52514e\">LOD 500<\/div>\n<div style=\"flex:1;background:#eef1f5;border-radius:5px;height:18px\">\n<div style=\"width:100%;background:#184f95;height:18px;border-radius:5px\"><\/div>\n<\/div>\n<div style=\"width:150px;text-align:right;font-size:13px;color:#0b0b0b\">Tel que construit<\/div>\n<\/div>\n<\/div>\n<h2>Les b\u00e9n\u00e9fices concrets du BIM sur le chantier<\/h2>\n<p>Au-del\u00e0 de la technologie, le BIM s\u00e9duit parce qu&rsquo;il r\u00e9pond \u00e0 des probl\u00e8mes tr\u00e8s concrets du secteur : d\u00e9passements de budget, retards, malfa\u00e7ons et litiges. Voici ce qu&rsquo;il apporte au quotidien.<\/p>\n<h3>Coordination et d\u00e9tection des conflits<\/h3>\n<p>En superposant les maquettes de l&rsquo;architecte, du structure et des fluides, un logiciel de coordination rep\u00e8re automatiquement les conflits : une gaine de climatisation qui traverse une poutre, une canalisation qui percute un faux plafond. D\u00e9tecter ces collisions \u00e0 l&rsquo;\u00e9cran plut\u00f4t que sur le chantier \u00e9vite des reprises co\u00fbteuses. Sur un projet de plusieurs milliers de m\u00e8tres carr\u00e9s, on estime souvent l&rsquo;\u00e9conomie potentielle \u00e0 plusieurs centaines de milliers de dirhams, \u00e0 titre indicatif, selon la complexit\u00e9.<\/p>\n<h3>Quantitatifs, planning 4D et co\u00fbts 5D<\/h3>\n<p>Puisque chaque objet porte ses donn\u00e9es, la maquette permet d&rsquo;extraire automatiquement les quantit\u00e9s : m\u00e8tres cubes de b\u00e9ton, m\u00e8tres carr\u00e9s de cloison, nombre de portes. On parle de 4D lorsqu&rsquo;on relie la maquette au planning pour simuler l&rsquo;avancement dans le temps, et de 5D lorsqu&rsquo;on y associe les co\u00fbts pour suivre le budget en direct. Ces dimensions suppl\u00e9mentaires transforment la fa\u00e7on de piloter un chantier.<\/p>\n<h3>Exploitation et maintenance<\/h3>\n<p>Une fois le b\u00e2timent livr\u00e9, la maquette \u00ab tel que construit \u00bb devient un manuel num\u00e9rique du patrimoine. Le gestionnaire y retrouve la localisation des \u00e9quipements, leurs r\u00e9f\u00e9rences et leurs \u00e9ch\u00e9ances d&rsquo;entretien, ce qui facilite la maintenance sur toute la dur\u00e9e de vie de l&rsquo;ouvrage.<\/p>\n<table style=\"width:100%;border-collapse:collapse;font-size:14px;margin:14px 0\">\n<thead>\n<tr>\n<th style=\"background:#1f3a5f;color:#ffffff;text-align:left;padding:11px 12px\">B\u00e9n\u00e9fice<\/th>\n<th style=\"background:#1f3a5f;color:#ffffff;text-align:left;padding:11px 12px\">Phase concern\u00e9e<\/th>\n<th style=\"background:#1f3a5f;color:#ffffff;text-align:left;padding:11px 12px\">Impact<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"padding:9px 12px;border-bottom:1px solid #e1e0d9;font-weight:600\">D\u00e9tection de conflits<\/td>\n<td style=\"padding:9px 12px;border-bottom:1px solid #e1e0d9\">Conception<\/td>\n<td style=\"padding:9px 12px;border-bottom:1px solid #e1e0d9\">Moins de reprises sur chantier<\/td>\n<\/tr>\n<tr style=\"background:#f5f7fa\">\n<td style=\"padding:9px 12px;border-bottom:1px solid #e1e0d9;font-weight:600\">Quantitatifs automatiques<\/td>\n<td style=\"padding:9px 12px;border-bottom:1px solid #e1e0d9\">\u00c9tude de prix<\/td>\n<td style=\"padding:9px 12px;border-bottom:1px solid #e1e0d9\">Chiffrages plus fiables<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:9px 12px;border-bottom:1px solid #e1e0d9;font-weight:600\">Planning 4D<\/td>\n<td style=\"padding:9px 12px;border-bottom:1px solid #e1e0d9\">Ex\u00e9cution<\/td>\n<td style=\"padding:9px 12px;border-bottom:1px solid #e1e0d9\">Meilleure ma\u00eetrise des d\u00e9lais<\/td>\n<\/tr>\n<tr style=\"background:#f5f7fa\">\n<td style=\"padding:9px 12px;border-bottom:1px solid #e1e0d9;font-weight:600\">Suivi des co\u00fbts 5D<\/td>\n<td style=\"padding:9px 12px;border-bottom:1px solid #e1e0d9\">Ex\u00e9cution<\/td>\n<td style=\"padding:9px 12px;border-bottom:1px solid #e1e0d9\">Budget pilot\u00e9 en temps r\u00e9el<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:9px 12px;border-bottom:1px solid #e1e0d9;font-weight:600\">Maquette d&rsquo;exploitation<\/td>\n<td style=\"padding:9px 12px;border-bottom:1px solid #e1e0d9\">Exploitation<\/td>\n<td style=\"padding:9px 12px;border-bottom:1px solid #e1e0d9\">Maintenance simplifi\u00e9e<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>L&rsquo;adoption du BIM au Maroc<\/h2>\n<p>Le Maroc suit une trajectoire d&rsquo;adoption progressive. Les grands projets structurants, les tours de bureaux, les h\u00f4pitaux, les infrastructures et certains programmes de logements haut de gamme sont les premiers \u00e0 imposer une d\u00e9marche BIM. Les promoteurs d&rsquo;envergure et les bureaux d&rsquo;\u00e9tudes les plus outill\u00e9s investissent dans ces comp\u00e9tences, souvent pouss\u00e9s par des ma\u00eetres d&rsquo;ouvrage internationaux ou des financements exigeant une tra\u00e7abilit\u00e9 renforc\u00e9e.<\/p>\n<p>Les \u00e9coles d&rsquo;ing\u00e9nieurs et d&rsquo;architecture marocaines int\u00e8grent de plus en plus le BIM dans leurs cursus, ce qui alimente peu \u00e0 peu un vivier de profils form\u00e9s. Des cabinets sp\u00e9cialis\u00e9s en accompagnement et en gestion de projet BIM \u00e9mergent \u00e9galement dans les grandes villes.<\/p>\n<h3>Les freins \u00e0 lever<\/h3>\n<p>L&rsquo;adoption reste in\u00e9gale. Le premier obstacle est la formation : ma\u00eetriser la m\u00e9thode demande du temps et un changement de culture, pas seulement l&rsquo;achat d&rsquo;un logiciel. Le deuxi\u00e8me est le co\u00fbt des licences et du mat\u00e9riel : les postes de travail performants et les abonnements annuels repr\u00e9sentent un budget \u00e0 titre indicatif de plusieurs dizaines de milliers de dirhams par poste et par an. Enfin, la coordination entre acteurs de maturit\u00e9 in\u00e9gale complique parfois le travail collaboratif, un intervenant rest\u00e9 en 2D ralentissant toute la cha\u00eene.<\/p>\n<h2>Les logiciels courants<\/h2>\n<p>L&rsquo;\u00e9cosyst\u00e8me BIM repose sur plusieurs familles de logiciels. Pour la mod\u00e9lisation, Revit d&rsquo;Autodesk et ArchiCAD de Graphisoft sont les r\u00e9f\u00e9rences du march\u00e9, largement utilis\u00e9s par les architectes et les bureaux d&rsquo;\u00e9tudes. Pour la coordination et la d\u00e9tection de conflits, Navisworks permet de f\u00e9d\u00e9rer les maquettes de diff\u00e9rentes disciplines et d&rsquo;y lancer des analyses de collisions. D&rsquo;autres outils compl\u00e8tent la cha\u00eene pour le calcul de structure, la thermique ou la gestion de chantier.<\/p>\n<p>Le choix d\u00e9pend des habitudes de l&rsquo;\u00e9quipe, des exigences du ma\u00eetre d&rsquo;ouvrage et du budget. L&rsquo;important n&rsquo;est pas tant le logiciel que la rigueur de la m\u00e9thode et la qualit\u00e9 des \u00e9changes, id\u00e9alement au format ouvert IFC pour garantir l&rsquo;interop\u00e9rabilit\u00e9 entre les diff\u00e9rents outils.<\/p>\n<h2>Vers une exigence dans les march\u00e9s publics ?<\/h2>\n<p>\u00c0 l&rsquo;international, de nombreux pays imposent d\u00e9sormais le BIM dans les march\u00e9s publics au-del\u00e0 d&rsquo;un certain montant. Le Maroc observe ces \u00e9volutions et il est raisonnable d&rsquo;anticiper une mont\u00e9e en puissance progressive de ces exigences dans les appels d&rsquo;offres publics, notamment sur les grands \u00e9quipements. Les entreprises qui se pr\u00e9parent d\u00e8s aujourd&rsquo;hui prennent une longueur d&rsquo;avance sur celles qui devront s&rsquo;adapter dans l&rsquo;urgence.<\/p>\n<h2>Conseils pour se lancer<\/h2>\n<p>Pour aborder le BIM sereinement, mieux vaut proc\u00e9der par \u00e9tapes. Commencez par un projet pilote de taille modeste plut\u00f4t que de basculer tout le portefeuille d&rsquo;un coup. Investissez d&rsquo;abord dans la formation des \u00e9quipes, car la m\u00e9thode prime sur l&rsquo;outil. R\u00e9digez ou adoptez une convention BIM qui d\u00e9finit clairement les r\u00f4les, les formats d&rsquo;\u00e9change et le niveau de d\u00e9tail attendu \u00e0 chaque phase.<\/p>\n<p>Privil\u00e9giez le format ouvert IFC pour ne pas d\u00e9pendre d&rsquo;un seul \u00e9diteur, et d\u00e9signez un r\u00e9f\u00e9rent BIM charg\u00e9 de coordonner les maquettes et de faire respecter les r\u00e8gles. Enfin, mesurez les gains obtenus sur ce premier projet pour convaincre en interne et \u00e9largir progressivement la d\u00e9marche.<\/p>\n<h2>FAQ<\/h2>\n<h3>Le BIM est-il r\u00e9serv\u00e9 aux grands projets ?<\/h3>\n<p>Non. S&rsquo;il s&rsquo;est d\u00e9velopp\u00e9 sur les grands chantiers, le BIM apporte aussi de la valeur sur des projets moyens, notamment pour fiabiliser les quantitatifs et anticiper les conflits techniques. Un usage simplifi\u00e9 reste possible sur des op\u00e9rations de taille modeste.<\/p>\n<h3>Combien co\u00fbte la mise en place du BIM ?<\/h3>\n<p>Le budget varie fortement selon la taille de la structure. Entre les licences, le mat\u00e9riel et la formation, il faut compter, \u00e0 titre indicatif, plusieurs dizaines de milliers de dirhams par poste la premi\u00e8re ann\u00e9e. Ce co\u00fbt est g\u00e9n\u00e9ralement compens\u00e9 par les \u00e9conomies r\u00e9alis\u00e9es sur les reprises et les litiges.<\/p>\n<h3>Faut-il un logiciel unique pour toute l&rsquo;\u00e9quipe ?<\/h3>\n<p>Pas n\u00e9cessairement. Chaque discipline peut utiliser son outil de pr\u00e9dilection \u00e0 condition d&rsquo;\u00e9changer au format ouvert IFC. C&rsquo;est cette interop\u00e9rabilit\u00e9, plus que l&rsquo;uniformit\u00e9 logicielle, qui garantit une collaboration fluide.<\/p>\n<h2>Conclusion<\/h2>\n<p>Le BIM au Maroc d\u00e9passe le simple effet de mode : c&rsquo;est une transformation durable des m\u00e9thodes de conception et de suivi de chantier. En centralisant l&rsquo;information dans une maquette num\u00e9rique enrichie, il am\u00e9liore la coordination, fiabilise les budgets et facilite l&rsquo;exploitation des b\u00e2timents. Les freins li\u00e9s \u00e0 la formation et au co\u00fbt sont r\u00e9els, mais surmontables avec une d\u00e9marche progressive et un projet pilote bien cadr\u00e9. Les promoteurs, bureaux d&rsquo;\u00e9tudes et entreprises qui s&rsquo;y engagent aujourd&rsquo;hui se donnent les moyens de r\u00e9pondre aux exigences de demain, y compris dans les march\u00e9s publics.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Le BIM au Maroc bouleverse la conception et le suivi des chantiers. D\u00e9couvrez la maquette num\u00e9rique, ses niveaux, ses b\u00e9n\u00e9fices, l&rsquo;adoption locale et comment se lancer.<\/p>\n","protected":false},"author":4,"featured_media":1120,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"fifu_image_url":"https:\/\/d8j0ntlcm91z4.cloudfront.net\/user_3DgEqYVPrudXiXUhzP8W1zFOrIm\/hf_20260716_212107_14e1e44d-fe4a-4b4a-bba7-66a687e903f5.png","fifu_image_alt":"Ing\u00e9nieur travaillant sur une maquette num\u00e9rique BIM","footnotes":""},"categories":[7],"tags":[100,103,80,101,102,104],"class_list":["post-1043","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-innovation-et-technologies-btp","tag-bim","tag-bureau-detudes","tag-construction-maroc","tag-maquette-numerique","tag-revit","tag-transformation-digitale"],"acf":[],"_links":{"self":[{"href":"https:\/\/tachrone.ma\/blog\/wp-json\/wp\/v2\/posts\/1043","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tachrone.ma\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tachrone.ma\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tachrone.ma\/blog\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/tachrone.ma\/blog\/wp-json\/wp\/v2\/comments?post=1043"}],"version-history":[{"count":1,"href":"https:\/\/tachrone.ma\/blog\/wp-json\/wp\/v2\/posts\/1043\/revisions"}],"predecessor-version":[{"id":1077,"href":"https:\/\/tachrone.ma\/blog\/wp-json\/wp\/v2\/posts\/1043\/revisions\/1077"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tachrone.ma\/blog\/wp-json\/wp\/v2\/media\/1120"}],"wp:attachment":[{"href":"https:\/\/tachrone.ma\/blog\/wp-json\/wp\/v2\/media?parent=1043"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tachrone.ma\/blog\/wp-json\/wp\/v2\/categories?post=1043"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tachrone.ma\/blog\/wp-json\/wp\/v2\/tags?post=1043"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}